30/03/07
Industrializados y mesas de encofrado
Reconstruction of Terminal T-4 at Barajas Airport in Madrid.
DRAGADOS begins to rebuild the floor slabs of Module D of the parking facilities at Termina T-4, Barajas airport. SEIS has helped to plan the job and is providing its table forms so that the structure can be built in four months only, with average production rates of 380 m2/day per team. |