Production process
The process used for a 10 cm panel has the following stages:
01.
Clean and prepare the molds, place the side forms and apply the form removal agent.
02.
Install the reinforcing bars (with their separators)
03.
Pour the concrete
04.
Vibrate it using a "vibrating table"
05.
Smooth the upper layer
06.
Cover the mold with an insulating top and accelerate the curing process if the temperature in the bay requires this or steam cure it
07.
Remove the mold after tipping it to a 70º-80º angle to lower the stresses caused by adherence
08.
Take it to the control area and check it over
09.
Transfer to the storage area to finish the curing process. Here the elements are stored upright in a row.
|